Projects
- Pumped Hydroelectric Energy Storage, AU
- Dust Control Equipment Audit, Queensland AU
- Forrestfield Airport Link, Perth AU
- Adelaide O-Bahn, Adelaide AU
- Perth Busport, Perth AU
- Central Interceptor, Auckland NZ
- Westconnex, Sydney AU
- Cross River Rail, Brisbane AU
- Sumner Tunnel, Boston USA
- Live Export Heat Stress Risk Assessment
- Clem Jones Tunnel, Brisbane AU
Dust control systems installed in labs across Queensland were inspected by Stacey Agnew in 2023 to review their installation and effectiveness. With the risk of exposure to silica dust resulting in silicosis, adequate control of dust was critical to the staff safety. We identified that several installations were underperforming due to incomplete or incorrect installation. On occasion we were able to immediately improve performance during the visit.
Following the conclusion of site visits, a summary of the recommended actions to improve system performance was provided.
Project details
Role
Audit
Services / Practice areas
Dust and Fume Control
Location
Queensland, AU