With a flurry of projects in recent years, Stacey Agnew have been actively engaged with the design several pumped hydroelectric energy storage (PHES) power plants.  With access tunnels, head and tail race construction and underground caverns housing power station infrastructure, ventilation and fire life safety can be complex issues with simple solutions.

Observing the ‘big-picture’, Stacey Agnew have the experience to propose practical concepts that return optimum results, not just for our area of engagement, but for the whole project.

Project details

Services / Practice areas

Tunnel Ventilation and Fire Safety, Fire Engineering

Location

AU